Make the trade-offs visible.

Explore how a decision engagement is framed, what it produces and how value can be evaluated. These are illustrative business scenarios based on AEVO capabilities, not published customer case studies or verified performance claims.

Live Solver

Three planning problems, one real optimization solver.

Pick a problem: a production mix, purchase orders against an uncertain forecast, or a battery trading on tomorrow’s prices. HiGHS solves each one in your browser, reports how close the plan is to the best possible, and shows which limit is worth relaxing.

Production mix

Four products, three lines, setup costs and limited line hours. The solver decides what to make on which line.

Contribution margin after setups

$64,969

Production plan (units)
Line 1Line 2Line 3
Product A — — —
Product B 278 409 —
Product C — — 480
Product D — — 182

Line hours

  • Line 1 Bottleneck

    250.2 of 251 h

  • Line 2 Bottleneck

    396.7 of 397 h

  • Line 3 Bottleneck

    396 of 396 h One more hour adds $68.67

Inventory and purchasing

Eight weeks of forecast demand, with a promotion in weeks 4 to 6. Every order has a fixed cost, stock costs money to hold, and the supplier can ship only so much a week. The solver decides when to order and how much.

Total cost: ordering plus holding

$9,591

Orders: 6 · holding cost: $2,391

  • Supplier capacity: 700 units/week Bottleneck

    One more unit of weekly supplier capacity saves $4.50

Orders, stock and safety stock by week (units)

Order Stock at week end Safety stock Supplier limit per week
Purchase plan (units)
Week Forecast demand Safety stock Order Stock at week end
Week 1 420 69 At capacity — 180
Week 2 380 72 At capacity 272 72
Week 3 460 99 At capacity 487 99
Week 4 520 123 At capacity 544 123
Week 5 610 161 At capacity 652 165
Week 6 580 168 At capacity 700 285
Week 7 450 141 At capacity 700 535
Week 8 400 135 At capacity — 135

Battery arbitrage

A 1 MW grid battery and an hourly price forecast for tomorrow. Every charge loses some energy and every cycle wears the battery. The solver decides when to buy power and when to sell it.

Margin for the day

$383

Sold: $742 · bought: $277 · wear: $82

  • Battery capacity: 4 MWh Bottleneck

    One more MWh of capacity earns $39.40 a day

  • Power: 1 MW Bottleneck

    One more MW of power earns $225.08 a day

Price forecast ($/MWh)

Charging (down) and discharging (up), MW

Energy stored (MWh)

Price Charge or discharge Stored Capacity
Hourly schedule (MWh)
Hour Price Charge Discharge Stored
00:00 $62 — — 0.0
01:00 $58 — — 0.0
02:00 $55 1.0 — 0.9
03:00 $54 1.0 — 1.9
04:00 $56 1.0 — 2.8
05:00 $63 — — 2.8
06:00 $78 — 0.6 2.1
07:00 $95 — 1.0 1.1
08:00 $88 — 1.0 0.0
09:00 $70 — — 0.0
10:00 $45 — — 0.0
11:00 $32 1.0 — 0.9
12:00 $24 1.0 — 1.9
13:00 $20 1.0 — 2.8
14:00 $26 1.0 — 3.8
15:00 $38 0.3 — 4.0
16:00 $64 — — 4.0
17:00 $98 — 0.8 3.2
18:00 $142 — 1.0 2.1
19:00 $165 — 1.0 1.1
20:00 $128 — 1.0 0.0
21:00 $96 — — 0.0
22:00 $80 — — 0.0
23:00 $70 — — 0.0

Uncertainty → decision

A forecast is not an order quantity.

Demand is uncertain. When running out costs more than leftovers, the best order sits above the median forecast, by an amount the costs decide.

80% forecast range (P10–P90) Median forecast (P50) Best order quantity
Critical ratio
75%
Median forecast (P50)
1,000 units
Best order quantity
1,121 units
Saving from the decision model
$117
Ordering the forecast versus the best quantity
Order quantityExpected cost of uncertainty
Order the P50 forecast1,000$574
Order the best quantity1,121$458

Illustrative model: normally distributed demand with mean 1,000 units and standard deviation 180; one ordering decision.

Manufacturing decisions

Step inside the decision.

Explore one factory, from receiving to dispatch. Change demand or production capacity, then see how the same quantities move through the scene and the calculation below.

An architectural view of receiving, two production lines, a warehouse and dispatch. The table below gives the same stage quantities.

The full order fits the stated capacity.

Delivered units
1,200 Baseline 1,200
Unfilled units
0 Baseline 0
Variable cost · USD
$31,500 Baseline $31,500

Cost per delivered unit · USD $26.25

Stage quantities and limits
Stage quantities and limits
Select a station Allocated units Effective capacity Capacity used
Receiving 1,200 1,500 80%
Line A 700 700 100%
Line B 500 600 83.3%
Warehouse 1,200 1,500 80%
Dispatch 1,200 1,600 75%
Calculation rules

Quantities are units per batch, with one received unit yielding one finished unit. Fixed limits: receiving 1,500; warehouse 1,500; dispatch 1,600. Each delivered unit includes USD 12 material, 2 handling and 3 dispatch, plus production: 8 on Line A or 11 on Line B. Total cost = A units × USD 25 + B units × USD 28. Unfilled units incur no modeled cost; a lower total after a stoppage may simply reflect fewer units delivered.

An illustrative factory, calculated in your browser. One period, one interchangeable product, no opening inventory, queues or fixed costs. It maximizes delivered units, then minimizes variable cost using Line A before Line B. Receiving, warehouse and dispatch limits are fixed. This is not live customer data, AI inference or a customer result. All amounts are USD.

Explore the decision engine Explore the supply network

Supply network laboratory

When one link changes, see the whole decision.

Select a supplier, change capacity or interrupt supply. The network reallocates quantities within the stated capacity and delivery limits, so you can compare the routes and their costs.

Supply network from three suppliers through two plants and one distribution hub to customer demand. The route table provides the same quantities.

On a small screen, swipe the network horizontally. Select a supplier to edit its assumptions.

Line width shows allocated quantity. Supplier-to-plant labels show units; downstream lines show the total passing through each link.

The full order can be delivered by the deadline.

Compare with the fixed baseline

On-time delivery
1,200 units Baseline 1,200 units · Change 0 units
Unfilled demand
0 units Baseline 0 units · Change 0 units
Variable supply cost
$32,900 Baseline $32,900 · Change $0
Compare with the fixed baseline
Measure Baseline Current scenario
On-time delivery 1,200 units 1,200 units
Unfilled demand 0 units 0 units
Variable supply cost $32,900 $32,900
Cost per delivered unit $27.42 $27.42
Longest used delivery route 6 days 6 days
Feasible network capacity 1,300 units 1,300 units
Route quantities and constraints
Line width shows allocated quantity. Supplier-to-plant labels show units; downstream lines show the total passing through each link.
Supply route Baseline Current scenario Route status
Supplier A → Plant 1 600 600 Allocated
Supplier A → Plant 2 0 0 Available, not allocated
Supplier B → Plant 1 100 100 Allocated
Supplier B → Plant 2 0 0 Available, not allocated
Supplier C → Plant 1 0 0 Available, not allocated
Supplier C → Plant 2 500 500 Allocated
Plant 1 → Distribution hub 700 700 Allocated
Plant 2 → Distribution hub 500 500 Allocated
Distribution hub → Customer orders 1,200 1,200 Allocated
Model assumptions
Supply route Fixed route capacity Variable cost / unit Delivery days
Supplier A → Plant 1 → Distribution hub → Customer orders 600 $28 4
Supplier A → Plant 2 → Distribution hub → Customer orders 350 $29 7
Supplier B → Plant 1 → Distribution hub → Customer orders 400 $31 5
Supplier B → Plant 2 → Distribution hub → Customer orders 450 $40 5
Supplier C → Plant 1 → Distribution hub → Customer orders 500 $35 6
Supplier C → Plant 2 → Distribution hub → Customer orders 500 $26 6

Model assumptions

One period, one interchangeable product, no opening inventory, split orders allowed and no fixed costs. Supplier capacities are shared across both plants. Plant 1 receives 55% of the combined production limit and Plant 2 receives 45%; the hub accepts up to 1,500 units. Route capacities, unit costs and delivery days are fixed and listed below. Delivery days add transport, processing and distribution time; queues are excluded. A route is unavailable when its supplier is interrupted, its capacity is zero or its delivery time exceeds the deadline.

How allocation is calculated

A deterministic minimum-cost flow calculation first finds the largest quantity that can reach the customer before the deadline, then the least variable cost for that delivered quantity. It respects supplier, plant, route and hub capacities. Unfilled demand is shown explicitly; no penalty cost, stochastic uncertainty or real-time scheduling is modeled.

An illustrative, browser-based network model. It maximizes on-time delivery, then minimizes variable cost for that quantity under the stated constraints. It is not live customer data, AI inference or a customer result. All monetary values are USD.

Explore the decision engine

Decision laboratory

Change an assumption. See the trade-off.

Explore three operating decisions with transparent calculations. Compare your assumptions with a fixed baseline before opening the decision engine.

Illustrative data and bounded formulas, calculated in your browser. This is not live customer data, model inference, an optimization solver or a claimed business result. All monetary values are USD.

Supply allocation

A larger order competes for inventory and production capacity. Compare the cost of external supply with the service you can actually deliver.

Model assumptions

Opening inventory: 400 units. Internal capacity: 800 units. Inventory and internal production: USD 40/unit; external supply: USD 65/unit. One period, identical products, no delivery delay or fixed costs.

Calculation rule

Use unprotected stock first, then internal production, then external supply up to its limit. Unfilled demand = order − delivered quantity. No claim of global optimality.

The order fits the stated capacity and protected inventory.

Delivered quantity
1,200 units
Supply cost
$53,000
Unfilled demand
0 units

Baseline and scenario comparison (units)

Baseline Your scenario
Equivalent results in a table
Baseline and scenario comparison
Measure Baseline Your scenario
Delivered quantity 1,200 units 1,200 units
Supply cost $53,000 $53,000
Unfilled demand 0 units 0 units
Inventory used 200 units 200 units
Internal production 800 units 800 units
External supply 200 units 200 units
Ending inventory 200 units 200 units

90-day cash runway

Growth can absorb cash before it generates receipts. Change collection and inventory timing to reveal the lowest cash point.

Model assumptions

Opening cash: USD 2m; no opening receivables. Daily sales: USD 40,000 before growth; purchases: 68% of sales; daily operating cash cost: USD 6,000. Supplier credit: 30 days. Constant sales, no tax, interest or financing inflows.

Calculation rule

Day 0 commitment = max(inventory days − 30, 0) × daily purchases. Receipts start after collection delay; supplier payments start after max(30 − inventory days, 0). Daily cash = prior cash + receipts − payments − operating cost. Funding need covers the lowest deficit.

Cash stays non-negative throughout the 90-day example.

Cash on day 90
$1,412,000
Lowest cash balance
$1,004,000
Additional funding needed
$0

Baseline and scenario comparison (USD)

Baseline Your scenario Lowest cash balance
Equivalent results in a table
Baseline and scenario comparison
Measure Baseline Your scenario
Cash on day 90 $1,412,000 $1,412,000
Lowest cash balance $1,004,000 $1,004,000
Additional funding needed $0 $0
Initial cash commitment $0 $0
Receipts over 90 days $2,400,000 $2,400,000
Supplier payments $2,448,000 $2,448,000
Operating cash costs $540,000 $540,000
Cash checkpoints shown in the chart (USD)
Day Baseline Your scenario
0 $2,000,000 $2,000,000
15 $1,502,000 $1,502,000
30 $1,004,000 $1,004,000
45 $1,106,000 $1,106,000
60 $1,208,000 $1,208,000
75 $1,310,000 $1,310,000
90 $1,412,000 $1,412,000

Energy cost and carbon

A renewable target meets a real supply limit. Compare energy cost and modeled emissions against your carbon ceiling.

Model assumptions

Renewable contract capacity: 1,100 MWh/period at USD 90/MWh; grid supply: USD 72/MWh. Illustrative factors: renewable 0.035 tCO₂e/MWh, grid 0.55 tCO₂e/MWh. Unlimited grid backup; no storage, time-of-use tariffs or certificate accounting. These are example factors, not a carbon inventory.

Calculation rule

Renewable supply = min(demand × requested share, 1,100). Grid supplies the balance. Cost and emissions are each the sum of source volume × source factor. A scenario is feasible only when the requested share is available and emissions meet the ceiling.

The requested share is available and modeled emissions meet the ceiling.

Energy cost
$112,140
Modeled emissions
445.6 tCO₂e
Delivered renewable share
45%

Baseline and scenario comparison (MWh)

Baseline Your scenario
Equivalent results in a table
Baseline and scenario comparison
Measure Baseline Your scenario
Energy cost $112,140 $112,140
Modeled emissions 445.6 tCO₂e 445.6 tCO₂e
Delivered renewable share 45% 45%
Renewable supply 630 MWh 630 MWh
Grid supply 770 MWh 770 MWh
Renewable supply shortfall 0 MWh 0 MWh
Emissions above ceiling 0 tCO₂e 0 tCO₂e

An urgent order. A constrained factory.

A manufacturer needs to assess a new order without disrupting existing commitments. Compare margin, material availability, machine capacity and delivery feasibility together. The output is a reviewable acceptance and scheduling recommendation, measured against delivery and contribution-margin baselines.

How value is measured

On-time delivery · contribution margin · schedule adherence · capacity utilization

Inventory decisions are cash decisions.

A multi-location business needs service levels without unnecessary stock. Model demand and lead-time uncertainty, compare replenishment policies, and trace their impact on stockouts, inventory days and the cash conversion cycle before changing the operating policy.

How value is measured

Fill rate · inventory days · stockouts · procurement cost · recovery time

Energy assets. One economic picture.

An operator considers coordinating solar, storage and flexible loads. Compare dispatch scenarios under tariffs, asset degradation and carbon objectives. Separate operating savings from investment assumptions, and validate feasibility before connecting asset controls.

How value is measured

Energy cost · peak demand · emissions · asset degradation · project cash flow

Start with a decision that matters.

Tell us where cost, capacity, risk or cash is limiting performance. We will help define a focused evaluation before committing to a wider transformation.